Polystyrene Tiles

22 08 2007

So .. what is the easiest way to get Polystyrene Tiles off a ceiling?

The reality is that apart from a Mr. Bean-esque explosion in the middle of the house – it is very hard work. The key is to understanding how it was put up in the first place. The tiles that I was dealing with had five blobs of adhesive, one in the middle and one on each corner. This led to the use of a fairly substantial burger flipper from my BBQ set. I needed a flat bladed utensil that allowed me to reach right across the tile from corner to corner. Anything less and I ended up damagin the tile.

Now … I know that I am trying to get the tiles down and therefore I don’t care if they get damaged, but I do care about having to clean up after myself. The Burger flipper was an old one, and I sharpened the end so that it would cut into the adhesive between the tile and the roof. As with serving cake, the first one is always a mess, but from there on it becomes easier. Start at the nearest corner and slide the burger flipper in to release that corner. Next release the other corner nearest to you, then slide the flipper under the central blob of glue. Finally the back two corners can be attacked and you should get the whole tile down in one piece.

Once you have completed removing the tiles there are two options with the rest of the ceiling.

  1. Getting a sharp flat tool, scrape the adhesive off the ceiling trying as much as possible not to gouge out great holes in the plaster or leave lumps on the ceiling. A 16m squared area to about 3 person days to tidy up. Alternatively …  
  2. The simplest answer is to get a plasterer to “overboard” the ceiling. This means putting plasterboard up and covering the ceiling and re-plastering the ceiling. In the words on my plasterer – “It took you 3 person days … I can have it overboarded in less than an hour!” – sold to the man in the overalls.

Those are your options and that’s what I did!





Business Value

22 08 2007

I think that, way too often, we get bogged down in the technology and don’t spend enough time taking a good long hard look at the value to the business community.

Another pet hate and therefore analagous to the above … Accountacy for Accountancy sake! I have just spent the last few days working on the budgets and forecast for the rest of 2007 until the end of the calendar year as well as the forecast for 2008. The problem I particularly face is that I have inherited a budget in my new role that wil lnot reflect what my new organisation structure should be. Having designed the way I want the organisation to work, I now need to tailor it to fit the money that I have. I accept that I don’t have a bottomless pit to work with, but it is a constraint I would rather not have. I guess the next issue becomes the internal negotiation for funds and the inevitable intra company transfers.

I have always thought that accountants have managed to pull off an incredible stunt in terms of making themselves indispensible to business. No longer do they worry about the money that is going out of the company and accounting for that in minute detail, they now have manufactured a role where they track every last penny that moves within the company as well. If I want a resource who is already paid for (ie: a salaried employee) to come and do some work for me whether for a short or long period of time – I have to find some virtual money to pay for them with. Instead of focusing on the business that is transacted we focus on the cash that is exchanged between departments.

It’s a gravy train!

Where is the business value? I have to justify doing a piece of work to my internal stakeholders even though no actual money will be spent! I take the people that I already have, assign them to the particular task and away we go. Somebody somewhere will of course question this and ask me who is going to fund the work.

Ford used to call them “Blue Dollars”, I’ve heard them referred to as “Wooden Dollars”, either way they don’t really exist and we need an ever expanding army of bean counters to count virtual beans!!

OK – I know the rhetoric … I just wanted to get that off my chest.

More importantly I do believe that, as technologists, we need to be able to justify what we are doing in terms of Business Value. I sat through a presentation the other day when I was shown some very cool interfaces to web-sites (no names, no packdrill etc). The problem is that most of our customers accessing our sites from home are disadvantaged and therefore probably don’t even have a computer of any sort. They were taken aback when I asked if their software was backwards compatible with Windows 95. Some people out there have never upgraded and don’t see the need. I digress … again!

Business Value … Technology can be cool, exciting and enthralling, but the rest of the world don’t see it like that. technology for technologies sake is a complete waste of time and effort. I need to justify my spend on staff and equipment etc. New technologies are going to have to prove to me that they can provide a direct business benefit before I will even entertain them nowadays.





Enterprise Information Management

10 08 2007

Enterprise Information Management is a term that is increasingly being used to describe the process and management of the Information mountain that corporations globally are building. With the falling price of storage and ever larger storage arrays, the question of limiting the amount of data that we store continues to be a non-discussion. The business increasingly tells us that they want to store ever more data and the IT can support that storage.

Having just moved house I think the problem is that the bigger the house the larger the amount of clutter that you keep in it! I seem to have moved house (and country) fairly regularly in my career and lifetime and it is always a surprise as to how much of what is moved to a new home remains in boxes, untouched, for many months and sometimes years. In our last home we had downsized and ended up paying for 100 sq feet of storage. After 18 months of paying for the storage we decided that we really needed to get rid of everything that we had in the lock-up because we hadn’t even been to look for anything in any of the stuff that we had there.

Admittedly this is not really a direct analogy to what is happening in business but I am convinced that many organisations are storing more data and yet not making the best use of it. We still get situations where data is not joined up.

With the move to a Service Oriented Architecture (SOA) I think it is imperative that the next step is taken by businesses to get a grip on their data mountains. Charlie Bess in his blog entitled “Is the need for Enterprise Information Management a symptom of success?” suggests that “As we move into having a more service based approach to the IT environment … it will require more than just common data.” I can wholeheartedly agree but I would expand on the thought to include the concept of a Service based Business. The IT part of a business is working towards being a service to the rest of the organisation and has always been seen in that light. I think the next stage of evolution is that the business needs to see itself as providing services to the rest of the organisation and being part of the SOA initiative.

The data element of the landscape has been missed in the past and the need to manage the information tree is crucial to future success in managing fraud and customer service. Data is the bulk of the iceberg – images of the Titanic flash in my mind. Leave this uncontrolled and the business will be wrecked. Manage the data mountain, control the information headache and then start building the Business Intelligence and finally the Knowledge tree and the groundwork has been laid to begin to control data costs and become more outward looking in your approach to services.





Setting up the Organisation

9 08 2007

Week 4 and I am getting to grips with the current and a future organisation structure. I think there is a key driver here and I am keen to ensure that I am not just another one of these managers that insists on changing an organisation structure just for the sake of it.

The key thing is to understand what it is that your organisation is trying to achieve and then ensure that you have people in the role that will enable that to happen and can take ownership of that piece of work. In my current role there is a natural point of change due to a major programme coming to an end for which the current organisational structure was designed to support.

I want to ensure that the organisation is built to meet the new challenges of Business As Usual and that is something which, suprisingly, needs thinking about quite carefully. Not only does it need careful consideration of the various roles, political sensitivities and structural semantics, but there is the requirement to handle the whole financial constraints as well.

Fortunately, there is an excellent team behind me that I know are going to be superb as we move forwards and I think everybody recognises that changes need to occur to ensure that we meet the new challenges. I am still impressed with the calibre of people that we have on the account and the sheer quality of work that I see. I know I am still digging under the covers but what I am currently unearthing has all been good.

The budget that I have to work within seems reasonable and for the moment it looks as if I will be able to manage the changes that I want to make relatively easily. The real key is to ensure that my management are comfortable with the changes and are ready to sign up to the new structure and the new emphasis.

The next piece is to understand who and how we engage with the customer. The new structure is going to have to support and match the new structure that the customer has implemented and ensure that we have the right level of engagement and relationship.

I have to say that it has been coming along really well and I am very encouraged by the way that all of this is working.





The First Flight

9 08 2007
G-BJWW Here is a picture of the aircraft that I flew today as part of my move to the Northwest of England. G-BJWW is a Cessna 172 and was a very pleasant aircraft to fly. The club that runs it is called Westair from Blackpool Airport (EGNH).

Having moved up to the Northwest of England I needed to join a new club and get back up in the air again. I have been remiss in getting up in the air due to having to get the new home in some form of order. Needless to say, the home is still being renovated although we are beginning to get to a point where we can see the light at the end of the tunnel.

It was a lunchtime flight and was more of a flight to confirm to the club that I could actually fly and was competent. My own opinion? I made so many mistakes because I was nervous including almost lining up on the wrong runway. I couldn’t believe some of what I did.

However, we took off on Runway 25 heading out towards the Irish Sea over the Pontins Holiday Camp. At the usual 600 feet we turned north towards Morecambe bay and the Lake District. G-WW performed effortlessly, getting us up to 3000 feet in good time – pretty much over Fleetwood.

MA (the Instructor) wanted me to do a stall so he asked me what I needed to do to prepare for that. In pilot speak – he wanted me to go through the HASEL checks;

H – Height – High enough to recover by 3000 feet
A – Airframe – Check whether we have the right configuration (flaps etc)
S – Security – Hatches, Harnesses anything loose in the cockpit
E – Environment – There is an ABC acronym which means to check for other Aircraft, Clear of Buildings and away from Clouds.
L – Lookout – perform a scan of the area by turning through 90 degrees left and right checking underneath as well.

So … we needed to get to 3,500 feet to satisfy the first piece of the acronym. Once there we executed the Stall and recovered easily. After that MA wanted to do a couple of turns (just dropped 100 feet in the left hand turn) and then we headed back to Poulton which is a Visual Reporting Point for Blackpool airport.

We did a few circuits after that and I wasn’t happy with my performance at all! However, I managed to perform a standard touch and go, a flapless touch and go and finally a glide approach.

My flight path

The final landing (on Runway 28) – the glide approach went well although I needed to take some flaps off as we were coming down too soon.

Once landed we took the second right (D1) taxiway from runway crossed runway 25 and then back to the Westair hangers.

It was only 35 minutes but it did show me that I need to get back up there again fairly soon.





Week 3

31 07 2007

Week 3 has begun and I am still continuing to be impressed with the calibre of people that I am meeting on the account. This encourages me that the move is a good one and has enabled me to move my career in the direction I wanted. The account has some significant challenges in both the technology and customer spaces but then the latter is generally true no matter where you go with this type of work. Providing a service for a government department is always a complex mix of red tape, personalities and technical challenges.

I got paid this week as well – from my previous employer and from my new employer. That was a nice surprise.

The challenges that I face currently I see as building an organisation that will be able to support;

  • The wind-down of the transformation programme and a move to “business as usual”.
  • Tighter control over the estate and greater governance with an Enterprise view of the customer.
  • Clearer and firmer client relationships.
  • Moving into the Value-add areas of the business – BPM, EIM and Application spaces.
  • The “WOW” factor

I think one of the other really key things that we need to achieve is getting the Architecture team to think more around the Value Proposition – very salesy I know, but essential to getting customer buy-in as well as account team buy-in. I think once we have that kind of a view then looking at the To-Be architecture will start to make sense as long as we don’t get technology focused.

Let’s see how this goes …





A New Chapter Begins …

16 07 2007

Today I begin a new chapter in my life having moved from my previous company – a well known global IT Services provider to a competitor organisation. My offices are based in the North West of the UK close to the account that I will be working with – The UK Department of Work and Pensions. There are a number of advantages to this – now that my gardening leave is over – and one of these is that the office is a stone’s throw away from Blackpool Airport where I first started to learn to fly.

I’ve been here over an hour and I am impressed with the efficiency of the new company and the welcome that I have received. Despite having 81 emails in my Inbox already! I’m sure I will discover the cracks in the very near future but at the moment it is great to be back “in the saddle” so to speak.

The last three months has been a melee of feelings and situations. I have completely gutted my parents house and started putting it back together again. That was a traumatic experience and I found it quite challenging. It was a really destructive process in the first instance but now it feels like we are creating something again. The plasterers were in the house all weekend and have made a significant difference to the way that I feel about the property. I was stunned at what a difference that made to me. Now I’m back at work and can’t really monitor the workmen – I feel somewhat disconnected.

 Anyway … I plan to be back online much more now that I have started work again – it’s a good reflective process to jot down my thoughts. Initial reactions to my new employer are positive – which is a good start!





G-BNXD – The Last Flight

13 06 2007
G-BNXD I went flying for the last time last night in G-BNXD, lovingly known as X-Ray, Delta. A colleague from Fujitsu Services and I had tried to arrange to go up together for some time. KevinW has got his MPPL (Microlight PPL) and was thinking of flying to Southend sometime and it seemed like a good opportunity to get a feel for the airfield and the environment.I’ve posted the details of the flight in my logbook on Google Spreadsheets.

The Flight Path that we followed can be viewed in Google Maps. We took in the sights of the QE2 Bridge across the Thames, Hanningfield and Abberton reservoirs and then back to Southend.

Kevin did quite a lot of the flying from just south of the Thames all the way to Abberton reservoir and turning towards Southend. I was caught out by Air Traffic Control (ATC) when they asked me to “turn left towards Burnham-on-Crouch” as Burnham is not actually marked on the map – there is a splodge of a town but it isn’t labeled. Anyway, I had a good idea where it was and as we went over it we radioed in as to where we were and were given a straight in approach to the airfield.

The only other notable point was that the PAPPI’s were out. These are the four red/white lights that help you determine if you are on the correct glide path to land at the airfield. It meant that my approach was not as good as I would have liked but I was happy with the landing.

Kevin and I then went off to the B52 for a quick bit of refreshment before going our separate ways.

It was another lovely experience in amongst the chaos of moving house.

Gotta go.





The Kitchen is Started

28 05 2007

It is long weekend here in the UK and so I decided to make a start on the kitchen. It was also a good idea because a good friend of ours JS is going to want to start work knocking a hole through from the Master Bedroom into the kitchen as part of our Master Bedroom En-Suite.

The house is what we call a “Dormer Bungalow” in the UK. That means that it is a single level home that has had extra rooms put into the roof together with a piece jutting out of the roof to provide extra space.

The downstairs has a very large lounge / dining room (30 feet long) along from front to back of one side of the house. The other side of the house has the bedroom and kitchen (front to back). The En-Suite will borrow 2 feet x 4 feet from the kitchen to give all the space that we want.

At the start the area where the new hole is going to be looked like this picture. You can see that all the units are in place and there are small ceramic yellow tiles on the wall. I’ve already removed the doors of some of the units. imag0548.jpg
imag0550.jpgimag0551.jpg Here is a picture of the same space with the kitchen units removed.
imag0554.jpg I have been advised that I should rent a gizmo that is a form of mechanical sledge hammer to remove the tiles but here you can see me using a common or garden hammer and axe! In the end I decided that a plasterers rectangular trowel was the best tool to use. It was thinner and wider and I could remove as many as six tiles in one go.
imag0556.jpg Here is the finished product – I managed to strip half the kitchen of tiles and also to remove all the polystyrene tiles from the ceiling. Scarily, one tile was half melted near the hot water boiler and looked like it could have set fire quite easily – that was a real worry!

… and that was my weekend.

I was expecting both the ceramic and polystyrene tiles to  be quite a difficult job to get off the wall and ceiling but in actual fact they came off relatively easily. The ceramic tiles were by far the worst, but the polystyrene tiles seemed to just pull off the ceiling because my father had put them up with 5 blobs of cement (one in each corner and one in the middle). This meant that it was simply a matter of pulling them away.

I was completely shattered after all of that. Now I have to find a way of getting the tiles into something that I can take to the re-cycling centre. I also have rubbish bags full of the old polystyrene tiles that I need to dispose of. Hmmm …





Starting the Project

23 05 2007

I am now starting a major project to upgrade my parents home after they have both moved into a care home. I have the privilege of being the proud owner of their home but as the property was built for my parents some 40 years ago (1962) it is in quite a state. My father is now 94 years old and therefore has been less and less able to look after the property.

There are some really difficult moments as we try to get rid of all the things that my parents have kept for years and years. They think that their knick-knacks are worth lots of money but getting the auctioneers in has left us with a different view about all the heirlooms.

However – I have started on the dismantling of the current rooms.

The Kitchen was the first to be attcked due to the fact that we need to knock a hole in the wall between the master bedroom and the kitchen for a new en-suite. We need a 1.2m x 0.6m intrusion into the kitchen. So … I started taking down the kitchen units that need replacing anyway;
The Kitchen

I also made a start on the fitted wardrobes in the bedroom;

Bedroom 1

Bedroom 2

I’ve got rid of two of the fitted wardrobes now and about three kitchen cabinets.

Not bad for the first day – gardening leave has it’s uses :-)